Key steps and precautions for installing an paper corner protection production line:

1、 Preparation before installation

Site selection: Ensure that the ground is flat and sturdy, reserve sufficient space, and plan the location for water and electricity access.

Equipment inspection: Check whether the equipment components are complete, inspect the appearance for damage, and prepare installation tools (such as level gauges, wrenches, etc.).

Personnel training: Arrange professional personnel to familiarize themselves with equipment principles, installation processes, and safety regulations.

2、 Installation steps

Basic construction: Make the foundation according to the equipment requirements, ensuring that the size, strength, and levelness meet the standards.

Equipment assembly: Assemble the paper angle edge corner making machine according to the instructions, paying attention to accurate and secure connection parts.

Pipeline and electrical connection: The pipeline connection should be firm and leak free, and the electrical installation should be carried out according to the drawings to ensure correct wiring.

Single machine debugging: Check the power supply and equipment operation status, and solve problems in a timely manner.

www.wd-cartonmachine.com

3、 Acceptance and maintenance after installation

Acceptance: Test the stability of equipment operation, spraying effect, and safety performance (such as testing the feeding speed of 1-25m/min for Hongcheng equipment).

Maintenance: Regularly clean, inspect fasteners, lubricate moving parts, and replace vulnerable parts.

4、 Common Problems and Solutions

Inconsistent installation environment: Check temperature, humidity and other parameters in advance, and rectify according to the equipment technical specifications.

Unstable foundation: Use a level to calibrate, reinforce the foundation, or add shock-absorbing pads.

Wiring error: Strictly follow the wiring diagram for construction and use a multimeter to verify the continuity of the circuit.

5、 Equipment Installation Support Policy

Free installation and debugging: Provide free installation and debugging services.

Warranty policy: The entire paper edge protector equipment is covered by a one-year warranty with lifetime service.

www.wd-cartonmachine.com www.wd-cartonamchine.com

www.wd-cartonmachine.com

If you are also interested in this machine,please don’t hesitate to contact us:

Overseas manager: Tom Wang

Email:cartonmachine.tomwang@aliyun.com

​Phone/WeChat/WhatsApp:+86 13303078975


Post time: Dec-24-2025